24m Dia × 16m Height MS Tank – 3 Nos
12m Dia × 12.5m Height Ethanol Tank – 2 Nos
4.1m Dia × 15m Length Bio-Diesel Underground Tank – 4 Nos
3.2m Dia × 10.1m Length Underground Tank – 4 Nos
Total Tanks: 13 Nos
750 MT
Arun Fabricators (under Indian Oil Corporation Limited – IOCL)
4 Years (2017 – 2020)
Guntakal, Andhra Pradesh, India










24m Dia × 16m Height MS Tank – 3 Nos
12m Dia × 12.5m Height Ethanol Tank – 2 Nos
4.1m Dia × 15m Length Bio-Diesel Underground Tank – 4 Nos
3.2m Dia × 10.1m Length Underground Tank – 4 Nos
Total Tanks: 13 Nos
750 MT
Arun Fabricators (under Indian Oil Corporation Limited – IOCL)
4 Years (2017 – 2020)
Guntakal, Andhra Pradesh, India





Fabrication and erection of pipeline (1.2m Dia to 2.2m Dia)
1,010 Meters
EDDC Co. Ltd (Mauritius)
1 Year (2021 – 2022)
Rwanda, East Africa
Larsen & Toubro Limited
Kattupalli, Chennai






Larsen & Toubro Limited
Kattupalli, Chennai





Dismantling old MS pipes and fixing new ones with couplers (860mm Dia pipes)
68 Pipes (each 1.5m length) and 34 Couplers
EDDC Co. Ltd (Mauritius)
September 2023 – February 2024
CEB Le Val Hydro Power Station, Mauritius
13m Dia × 12m Height SKO Tanks – 3 Nos
260 Tons
Arun Fabricators (under Hindustan Petroleum Corporation Limited – HPCL)
1.5 Years (2021 – 2022)
Dharmapuri, Tamil Nadu, India






13m Dia × 12m Height SKO Tanks – 3 Nos
260 Tons
Arun Fabricators (under Hindustan Petroleum Corporation Limited – HPCL)
1.5 Years (2021 – 2022)
Dharmapuri, Tamil Nadu, India



TLF, Pump House, Handrails, and Walkway Platforms
450 MT
Arun Fabricators (under IOCL)
2 Years (2019 – 2020)
Guntakal, Andhra Pradesh, India
Sheet fixing for Railway Gantry Shed (750m Length × 23m Width)
16,500 QM
Arun Fabricators (under IOCL)
45 Days (2020)
Guntakal, Andhra Pradesh, India






Sheet fixing for Railway Gantry Shed (750m Length × 23m Width)
16,500 QM
Arun Fabricators (under IOCL)
45 Days (2020)
Guntakal, Andhra Pradesh, India






40 MT
EDDC Co. Ltd (Mauritius)
February 2024 – August 2024
Alteo Sugar Plant, Mauritius
50 MT
EDDC Co. Ltd (Mauritius)
May 2024 – August 2024
Alteo Sugar Plant, Mauritius










50 MT
EDDC Co. Ltd (Mauritius)
May 2024 – August 2024
Alteo Sugar Plant, Mauritius





30,100 Inch-M
Arun Fabricators (under IOCL)
6 Months (2020)
Guntakal, Andhra Pradesh, India
Dismantling old SS pipes and fabrication & erection of new pipes (1.4m Dia to 2.25m Dia
71 Meters
EDDC Co. Ltd (Mauritius)
4 Months (March 2023 – June 2023)
Alteo Sugar Plant, Mauritius










Dismantling old SS pipes and fabrication & erection of new pipes (1.4m Dia to 2.25m Dia
71 Meters
EDDC Co. Ltd (Mauritius)
4 Months (March 2023 – June 2023)
Alteo Sugar Plant, Mauritius





Drain construction measuring 443m Length × 2.8m Height × 3.75m Width
443 Meters
EDDC Co. Ltd (Mauritius)
January 2024 – Ongoing
Port Louis, Mauritius
Handrails, Cable Tray Supports, and Walkway Platforms
450 Tons
Arun Fabricators (under IOCL)
6 Months (2021)
Vijayawada, Andhra Pradesh, India




Handrails, Cable Tray Supports, and Walkway Platforms
450 Tons
Arun Fabricators (under IOCL)
6 Months (2021)
Vijayawada, Andhra Pradesh, India





Fabrication and erection of Train Proposed Loco Shed (90m Length × 45m Width – 2 Nos)
480 Tons
Shree Balaji Engicons Pvt. Ltd (under NTPC)
1 Year (2020 – 2021)
Darlipalli, Odisha, India